Given: number of servers = 3, the inter-arrival time = 2 minute, the service time = 6.5 minutes, the first arrival is at t=0, Simulation begins at t=0, and simulation time is 20 minute. Complete the following records of hand simulation. List three "departures" and one "arrival" in your future events calendar.

Answer :

Other Questions