Orlando Enterprises reports the following information at December 31, 2016:a. Requirement 1. What is the actual manufacturing overhead of Orlando Enterprises?The actual manufacturing overhead of Orlando Enterprises is_______$b. Requirement 2. What is the allocated manufacturing overhead?The allocated manufacturing overhead is________$c. Requirement 3. Is manufacturing overhead underallocated or overallocated? By how much?Manufacturing overhead is by_______$

Respuesta :

Answer:

1)  C=C1+C2...+Cn

2) A=A1+A2...+An

3) Explanation is in the description

Explanation:

First, we have that the information given is incomplete. We need the information of the manufacturing overhead of Orlando Enterprises. Then, we are going to work on the problem without any specific data and give a general answer that will serve for any such data.

The attached table shows a way to represent the information of the manufacturing expenses, where the left column represents the current costs and the right column the allocated costs.

1) Current manufacturing overhead is then given by:

C=C1+C2...+Cn

2) 2) The allocated manufacturing overhead is given by:

A=A1+A2...+An

3) Finally, to determine if manufactured overhead is underallocated or overallocated:

X=C-A

If x>0, the manufactured overhead is udercalled.

Ver imagen josealejandrocl