F jackson collectibles, inc. has a safety stock of 35 units and the average weekly demand is 14 units, how many days can be covered if the shipment from the supplier is delayed ?

Respuesta :

17.5 Days can be covered if the shipment from the supplier is delayed.

What Average Demand?

Average demand, which is calculated by dividing the total number of kilowatt-hours by the number of units of time in the interval, is the demand for the electrical system or any of its components throughout a specific period of time with a long length.

According to the information:

35 items make up Jackson Collectibles' safety supply.

However, 14 units are needed each week.

The amount of weeks they may survive on safety stock as a result is:

= Weekly demand / safety stock

= 35 / 14

= 2.5 weeks

These are in days:

= 2.5 * 7

= 17.5 days