Imagine you work a a conultant, and your daily job involve litening to the contructive criticim of other. A part of your job, you mut liten to oppoing viewpoint to make important deciion. In thi activity, you are a conulting dam engineer. You mut make a deciion about four different dam; hould they be repaired, taken down, or left alone? You will liten to contrating opinion about what hould be done with the dam before you make the final deciion. A the conulting dam engineer, what do you decide to do with thi dam? Explain your reaoning. By making your deciion, did you upport the opinion of the mayor and/or the dam afety official? Why or why not?

Respuesta :

The lack of information is the major reason behind the delay in process of decision making and construction procedure.

According to the  given, there are several challenges that may occur. However, there are few points which are very difficult to follow, these are:

Listening to opposing viewpoints.

Listening to the opinions from other contrasts.

Consider any of the structural, meteorological, or environmental characteristics of this dam.

Illuminate, clarify, support, or justify my reasoning

Considering the opinion of the mayor

Considering the opinion of the dam safety officer    

The reason for the difficulty behind all of these is the lack of information given in the question.

What are the principles of construction and design ?

There is whole lot more details and information needed to display on the existing structure, its history and its composition.  If that's too much trouble for them, or they don't like it, then they can go and get themselves another dam consulting engineer.

Thus, we can conclude that the lack of information is the major reason behind the delay in process of decision making and construction procedure.

Learn more about the principles of construction and design of building from given link

brainly.com/question/19068962

#SPJ4