contestada

Technical Performance Measures should be selected for those parameters that: [Use Technical Performance Measures to track progress in program risk areas during systems development.]

A. Are expected to have the highest degree of risk.
B. Will not be addressed at technical design reviews.
C. Are expected to exceed the objectives contained in the Capability Development Document (CDD).
D. Will not be subjected to formal test and evaluation.

Respuesta :

Answer:

The correct answer is letter "A": Are expected to have the highest degree of risk.

Explanation:

A Technical Performance Measure or TPM is an instrument that shows how well a program meets its specifications or goals. Technical Performance Measures are useful for risk tracking to identify the factors of an objective that can potentially affect the original plan of an organization.

Technical performance measures should be selected for those parameters that are expected to have the highest degree of risk. Thus, Option A. is the correct statement.

What do you mean by technical performance measures?

A Technical Performance Measure is a system that measures the risks involved in a technical system to determine how well an item meets the stated requirements.

Technical Performance Measure or TPM is a tool that shows how well a system meets its specifications or objectives. They are useful in tracking risks in order to identify objective factors that may influence an actual organizational process.

Thus, Option A. that is "Technical performance measures are expected to have the highest degree of risk" is the correct statement.

Learn more about Technical Performance Measures, refer to the link:

https://brainly.com/question/14315469