When designing a forced-air distribution system, the ____________________ must have the capacity to move air at the required air flow rate against the resistance in the distribution system.

Respuesta :

Lanuel

When designing a forced-air distribution system, you must use a blower with enough capacity to move (distribute) air at the required air-flow rate against the resistance generated in the distribution system.

A forced-air distribution system can be defined as a heating, ventilation, and air conditioning (HVAC) system that is designed and developed to move temperature-controlled or heat-bearing air into a building, especially through its plenum, air ducts and vents.

Generally, a forced-air distribution system comprises the following components:

  • Grills
  • Supply ductwork
  • Return ductwork
  • Registers
  • Blower

A blower is considered to be the main component of a forced-air distribution system. Hence, a blower with enough capacity to move (distribute) air at the required air-flow rate against the resistance generated in the distribution system must be used when designing a forced-air distribution system.

Read more: https://brainly.com/question/23960489