A batch of 1000 is split into 10 smaller batches of equal size 100. The processing time of each unit is 2
minutes on every machine and the set-up time is 30 minutes. The batch is processed over a serial line of 5
machines. The lead time of the actual batch will be ____ in minutes

Respuesta :

The lead time of the actual batch will be in

  • 2950 in minutes

What is Processing Time?

This refers to the amount of time which is taken for a processor to run a procedure and return a result.

We can see that a batch of 1000 is split so that they each have 10 smaller batches which has an equal size of 100 each, then if the processing time is 2 mins per machine and the set up time is 30 mins.

Hence, when this batch is processed over a serial line of 5 machines, then the lead time of the actual batch would be 2950 in minutes