HELP PLZ! I will choose the Brainliest answer if correct.

At a construction site, workers are moving dirt from a pile to fill a hole. The function graphed models the volume of dirt, y, in cubic feet, remaining in the pile after x hours.

What do the key features of the graph indicate in this situation?

Drag and drop the answers into the boxes.



The______ indicates that the entire pile of dirt will have been moved after_____ hours.

Option box:
0 6 75 450 x-intercept y-intercept slope

HELP PLZ I will choose the Brainliest answer if correct At a construction site workers are moving dirt from a pile to fill a hole The function graphed models th class=

Respuesta :

The x-intercept indicates that the entire pile of dirt will have been moved after 6 hours.

Answer: The x-intercept indicates that the entire pile of dirt will have been moved after 6 hours.


Step-by-step explanation:

Given: A  function graphed models the volume of dirt y in cubic feet, remaining in the pile after x hours.


We can see from the graph that the slope of the line tells that the volume dirt is moving with respect to time and the equation of line could be in intercept form where y intercept tells the total maximum volume of dirt i.e. 450 cubic feet and x- intercept tells the entire volume of dirt had been moved after 6 hours.